Tiered grey block retaining walls with planted terraces holding a hillside section above a concrete driveway in Lower Hutt
Naenae, Wellington region

Retaining Walls in Naenae

Top Retaining Walls Lower Hutt builds retaining walls across Naenae, on ground that is about as straightforward as the Hutt Valley gets. Naenae sits on the flat, on river gravel carried down from the Tararua Range, which digs predictably and founds a post well.

  • Timber, block, gabion, stone and engineered walls
  • Full drainage behind every wall we build
  • Consents lodged through Hutt City Council

Get your free quote

Step 1 of 4

What are you building?

Takes about 30 seconds. Pick the closest one.

How tall is the wall?

Measure the ground you need held back, not the fence above it.

What sits above the wall?

This decides whether you need a building consent.

Almost done. Where do we send it?

We reply the same working day.

No obligation. Prefer to talk? Call [PHONE].

  • Drainage on every wall300mm of metal, a drain coil and geotextile. Never an optional extra.
  • H5 poles as standardThe right treatment for timber that lives in wet ground.
  • Consents handledHutt City, Upper Hutt and Wellington, start to finish.
  • Itemised quotesYou see what the drainage and the spoil actually cost.

A flat suburb that needs a lot of walls

Naenae was built out from the 1940s as government state housing, on generous flat sections laid out around the centre. Almost nothing here needed a retaining wall when it was built.

What creates the walls is what people have done since. Sections have been split, houses added at the back, decks and patios cut in, and driveways lowered. Every one of those changes leaves a step in level that has to be held somewhere.

Naenae at a glance
Council for consentsHutt City Council
Typical groundFlat valley floor river gravel
Walls we build most hereTimber pole and sleeper walls
Consent threshold1.5m of retained ground, or any surcharge above the wall
Drainage300mm metal, perforated coil, geotextile, on every wall
Site visitFree, with a written quote to follow
Retaining wall built in Naenae, Lower Hutt
Recent work near Naenae.

Infill walls are short but not simple

These walls are usually 400mm to 1.2m and run along a boundary. They look simple and they mostly are, as long as the treatment level is right and the drainage goes in.

The thing to check is what sits above. When fill for a new build slopes up behind your wall, that fill is a surcharge, and a surcharge takes the job outside the consent exemption even when the wall is well under 1.5 metres. It is the most common surprise we deal with in infill suburbs.

Good access keeps Naenae prices sensible

Wide flat sections with room down the side mean a machine can usually reach the wall line, and that is the single biggest thing keeping the price at the better end of the range.

Compared with a hill job in Normandale or Stokes Valley, the same 12 metres of wall here will often come in noticeably cheaper for no reason other than that we can drive to it.

Not sure whether your wall needs a consent? Send us a photo and a rough height. Under 1.5m of retained ground with nothing loading it from above is exempt. A driveway, a building, a pool or fill sloping up behind it is a surcharge, and that changes the answer.

Common questions

Retaining walls in Naenae: common questions

My neighbour's new build is higher than my lawn. Whose wall is it?

Generally the party whose soil is being retained, because the wall holds their ground. Get any cost sharing agreement in writing before work starts. We can provide a written scope you can both look at.

How long does a small Naenae wall take?

Most 8m to 12m garden walls take one to two days once we start, plus curing time for the post concrete before we backfill against it.

Wall types

Retaining walls we build in Naenae

Timber pole retaining wall built on a Lower Hutt section

Timber Retaining Walls

Timber does most of the work in the Hutt Valley. A pole and rail wall goes up in a few days, costs less per metre than anything else, and holds a 1.2m step in level.

See more
Concrete block retaining wall built in Lower Hutt

Concrete and Block Retaining Walls

Concrete goes in wherever something heavy sits above the wall, and in a city built beside an active fault it is also what engineers reach for first. We build.

See more
Engineered retaining wall under construction on a Lower Hutt hillside

Engineered Retaining Walls

Past 1.5m, or once a driveway or building sits above it, the job changes completely. You need a chartered engineer, a building consent from Hutt City Council and.

See more
Gabion basket retaining wall filled with Wellington greywacke

Stone and Gabion Retaining Walls

Stone suits the Hutt hills, where a hard manufactured face can look wrong against bush and rock. The whole region is founded on greywacke, so local quarries put out.

See more

Need a retaining wall in Naenae?

Answer three quick questions or call [PHONE] and we will book a free site visit.