Timber Retaining Walls
Timber does most of the work in the Hutt Valley. A pole and rail wall goes up in a few days, costs less per metre than anything else, and holds a 1.2m step in level.
See more
Top Retaining Walls Lower Hutt builds retaining walls throughout Petone, where the ground asks harder questions than anywhere else in the valley. Petone sits on the softest sediments in the Hutt basin, and the thickest known layer of them, around 27 metres, sits near the western end of the foreshore.
Soft sediments more than 10 metres thick underlie much of Petone and central Lower Hutt. That is a very different founding condition to the dense Waiwhetu gravels further up the valley, and it changes footing design on anything structural.
The southwest end of the valley, from Petone through to Seaview, has also been assessed as having high liquefaction potential. That does not stop you building a wall. It does mean a flexible wall type is often the smarter choice, and that anything engineered needs a design written for this ground rather than lifted off a standard detail.
| Council for consents | Hutt City Council |
|---|---|
| Typical ground | Soft marine sediments, shallow water table |
| Walls we build most here | Concrete sleeper and gabion |
| Consent threshold | 1.5m of retained ground, or any surcharge above the wall |
| Drainage | 300mm metal, perforated coil, geotextile, on every wall |
| Site visit | Free, with a written quote to follow |

Petone was the first European settlement site in the Wellington region, back in 1840, and the street grid around Jackson Street still reflects that age. Sections are long and narrow, houses sit close to the boundary, and there is often barely a metre between the villa wall and the fence line.
A 200mm timber pole plus rails plus 300mm of drainage metal eats most of that. Steel post and concrete sleeper walls solve it, because the post is around 100mm wide and the panels are thin. On the tightest jobs down here it is the deciding factor.
The beach is a few streets from most of Petone. On gabion work we specify PVC coated mesh rather than bare galvanised, and we use hot dip galvanised or stainless fixings throughout, because salt air works on cheap fixings quickly.
Drainage discharge takes real planning here. The land is flat, the water table is close to the surface, and there is almost no fall to work with. We sort the outlet before anything gets dug, and often that means connecting to stormwater rather than discharging to daylight.
Not sure whether your wall needs a consent? Send us a photo and a rough height. Under 1.5m of retained ground with nothing loading it from above is exempt. A driveway, a building, a pool or fill sloping up behind it is a surcharge, and that changes the answer.
Yes. The design has to suit soft sediment and a shallow water table, which usually means a flexible wall type and careful thought about where the drainage discharges. It is not a reason to go without a wall.
Steel post and concrete sleeper. The posts are about 100mm wide, roughly half the footprint of a timber pole wall once you count the drainage zone behind it.

Timber does most of the work in the Hutt Valley. A pole and rail wall goes up in a few days, costs less per metre than anything else, and holds a 1.2m step in level.
See more
Concrete goes in wherever something heavy sits above the wall, and in a city built beside an active fault it is also what engineers reach for first. We build.
See more
Past 1.5m, or once a driveway or building sits above it, the job changes completely. You need a chartered engineer, a building consent from Hutt City Council and.
See more
Stone suits the Hutt hills, where a hard manufactured face can look wrong against bush and rock. The whole region is founded on greywacke, so local quarries put out.
See moreAnswer three quick questions or call [PHONE] and we will book a free site visit.