Timber Retaining Walls
Timber does most of the work in the Hutt Valley. A pole and rail wall goes up in a few days, costs less per metre than anything else, and holds a 1.2m step in level.
See more
Top Retaining Walls Lower Hutt builds retaining walls throughout Normandale, on the western hills between Maungaraki and Belmont. Normandale is steep, leafy and served by narrow winding roads, and all three of those facts show up in how a wall gets built here.
The roads climbing Normandale are tight and winding with limited places to park a truck, let alone a truck and trailer. That decides machine size and how materials get delivered before we even look at the wall.
We plan the delivery and the spoil route at the quote stage. On the tighter streets that sometimes means smaller loads more often, which costs more, and we would rather tell you that up front than surprise you with it.
| Council for consents | Hutt City Council |
|---|---|
| Typical ground | Weathered greywacke on a steep bush clad slope |
| Walls we build most here | Timber pole, crib and gabion |
| Consent threshold | 1.5m of retained ground, or any surcharge above the wall |
| Drainage | 300mm metal, perforated coil, geotextile, on every wall |
| Site visit | Free, with a written quote to follow |

A lot of Normandale sections back onto native regrowth, and a hard manufactured block face against bush looks wrong immediately. Timber pole walls, crib walls with planted front cells and gabions all sit better in that setting.
Gabions in particular green over within a couple of seasons, so the wall stops reading as a structure and starts reading as part of the slope.
Weathered greywacke clay sheds water rather than absorbing it, and these slopes are steep. Getting surface and subsurface water off the site in a controlled way is part of keeping the slope stable, not just part of protecting the wall.
We think carefully about where the drain coil discharges. Moving water from behind your wall to the top of your neighbour's bank is not a solution, it is a transfer.
Not sure whether your wall needs a consent? Send us a photo and a rough height. Under 1.5m of retained ground with nothing loading it from above is exempt. A driveway, a building, a pool or fill sloping up behind it is a surcharge, and that changes the answer.
Usually, with the right machine and smaller loads. Send photos of the road frontage and the driveway with your enquiry and we will tell you before we visit.
Gabion, crib with planted cells, or timber. All three sit better against native regrowth than a hard block face, and all three drain well.

Timber does most of the work in the Hutt Valley. A pole and rail wall goes up in a few days, costs less per metre than anything else, and holds a 1.2m step in level.
See more
Concrete goes in wherever something heavy sits above the wall, and in a city built beside an active fault it is also what engineers reach for first. We build.
See more
Past 1.5m, or once a driveway or building sits above it, the job changes completely. You need a chartered engineer, a building consent from Hutt City Council and.
See more
Stone suits the Hutt hills, where a hard manufactured face can look wrong against bush and rock. The whole region is founded on greywacke, so local quarries put out.
See moreAnswer three quick questions or call [PHONE] and we will book a free site visit.